faq
WPC landscaping on university campuses — What should be confirmed before ordering?
Campus landscaping must account for delivery vehicles, event equipment and maintenance routes as well as students on foot. Document which loads each WPC area is designed to receive. Confirm the three project checks below with the supplier and the responsible designer. A sample establishes appearance, not approval of the complete installation. Permitted loads map; Event-service coordination; Future alteration control