faq
WPC paths in community allotments — What should be confirmed before ordering?
An allotment path needs to work with soil, watering and shared maintenance. Preventing debris accumulation can matter as much as selecting the board finish. Confirm the three project checks below with the supplier and the responsible designer. A sample establishes appearance, not approval of the complete installation. Soil separation; Wheelbarrow route; Named maintenance lead