faq
What to record in a WPC installation site diary — What should be confirmed before ordering?
A useful installation diary links concealed details and site decisions to exact locations. General photographs without dates or context are difficult to use when investigating a later defect. Confirm the three project checks below with the supplier and the responsible designer. A sample establishes appearance, not approval of the complete installation. Location-linked photos; Drawing and batch records; Approved deviations